top of page

Spécialistes en aménagements cyclistes

A fully lit solar-powered bike path in Saint-Eustache


To promote the safe use of bicycles on its cycling path crossing the municipal cemetery, the City of Saint-Eustache has turned to Halt to install an ecological, sustainable and energy-autonomous lighting solution. Halt, with the help of an authorized subcontractor, installed 170 solar-powered lighting studs in August 2019.

After going through a first winter and our harsh weather conditions, the lighting studs have demonstrated their durability and perform as well as the first day of their installation.


Congratulations to the City of Saint-Eustache for this green initiative!

Mots-clés :

Retrouvez-nous sur
Find Us on
  • Facebook Basic Square
  • LinkedIn Social Icon
  • Twitter Icône sociale
bottom of page